<p>Have you considered scheduling the change in version published in
each COPR repository so it doe <i>not</i> coincide with the
release of a new version of BIND?</p>
<p>I have some hosts tied to the COPR for BIND-ESV, and some tied to
BIND. I hit a stumbling block during the last "roll over" event,
and it took me a a bit to figure out if it was due to the switch
of BIND-ESV from 9.11 - > 9.16 in the repository, or the switch
from 9.16.x -> 9.16.y in the code-release. </p>
<p>If we could have the version published in the BIND-ESV repository
advance to the same version which was most recently published in
BIND repository (i.e. ship 9.18.x in BIND, a couple of weeks later
roll BIND-ESV to 9.18.x and BIND to 9.20.x, and a couple of weeks
later release 9.18.y and 9.20.y), then problems with the COPR
"roll over" would be a little more obvious.<br>
</p>
<pre class="moz-signature" cols="72">--
Do things because you should, not just because you can.
John Thurston 907-465-8591
<a class="moz-txt-link-abbreviated" href="mailto:John.Thurston@alaska.gov">John.Thurston@alaska.gov</a>
Department of Administration
State of Alaska</pre>
<div class="moz-cite-prefix">On 6/17/2024 2:32 AM, Michał Kępień
wrote:<br>
</div>
<blockquote type="cite" cite="mid:ZnAQs_YgEyvP_jPn@larwa.hq.kempniu.pl">
<pre>While I don't have a specific date for you, we plan to do such a
"rollover" again when BIND 9.20.1 or 9.20.2 gets released, i.e. in about
2-3 months from now. We will definitely roll all three repositories at
the same time, i.e.:
- "bind-esv" will move from 9.16 to 9.18,
- "bind" will move from 9.18 to 9.20,
- "bind-dev" will move from 9.19/9.20 to 9.21.</pre>