Hi all

A spreadsheet of our combined estimates is attached to this email. This
time we got 4 developers' estimates.

If you wish to discuss any of the following, please do so. Otherwise
I'll update the tickets with the estimates this evening.


Unestimated tickets
-------------------

* #3042 ("Init Shutdown" resulted in error messages in BIND10 logfile)
Got only 1/4 estimates.

* #3060 (DHCP ticket)
DHCP tickets make it into our list because they are filed with
the "DNS" sub-project instead of the "DHCP" sub-project. I'll try to
re-assign them to "DHCP" before generating the estimation spreadsheet
from next time.

* #3044
* #3045
* #3046
These are still open due to a Trac bug and can be ignored.


Wide estimates
--------------

None.

		Mukund
-------------- next part --------------
A non-text attachment was scrubbed...
Name: estimates-sprint-2013-08-06-combined.ods
Type: application/vnd.oasis.opendocument.spreadsheet
Size: 19725 bytes
Desc: not available
URL: <https://lists.isc.org/pipermail/bind10-dev/attachments/20130723/8e899a9d/attachment-0002.bin>
-------------- next part --------------
A non-text attachment was scrubbed...
Name: not available
Type: application/pgp-signature
Size: 801 bytes
Desc: not available
URL: <https://lists.isc.org/pipermail/bind10-dev/attachments/20130723/8e899a9d/attachment-0003.bin>


More information about the bind10-dev mailing list